Documentation
Where Changeline appears, how each of the five measures is counted, what it shows on a work item, what a deployment is, what a failure is, and what it stores.
- Getting started
Where Changeline appears in Jira Cloud once installed: a tab in each space, the Apps page, a work item and a dashboard gadget, and what to do first.
- The five measures
How Changeline counts the five DORA measures, how each moved against your own past, where the lead time goes, the Trend chart and the Spaces tab.
- The work item panel
The Changeline panel and Details column on a Jira work item: change lead time by stage, the release it shipped in and whether that release failed.
- What counts as a deployment
A released version, or a work item that reaches Done: what Changeline counts as a deployment in Jira, and why it does not read CI/CD data.
- Failures and recovery time
What counts as a failure in Jira: a work item that points at a release, how long it took to recover, rework, and the spaces failures are read from.
- Settings
The site-wide settings a Jira admin can change: what a deployment is, when lead time starts, the failure work types and the spaces failures are read from.
- What is stored
The permissions Changeline asks for, what it reads, what it stores in Forge storage, and why nothing leaves your Atlassian site or is written to Jira.