The top of the page
Everything above the tabs is the same on a space’s Changeline tab and under Apps › Changeline. Top to bottom: a headline, one grey line with its age, the Period chip, DORA’s four keys, a Flow row and an amber box. The tabs under them list what was counted: see The tabs.

The headline
The headline says how many releases shipped in the period, then counts what needs a look. Each count is a button that opens its list.
- failing: releases with a failure not recovered yet.
- slow: work that waited to start or for a release more than twice the usual.
- waiting to ship: work that is done and in no released version yet.
- shipped clean: releases no failure points at.
A count of 0 is not drawn. Where a deployment is a work item reaching Done, the headline counts work items, and the last count is done clean.
For example, the Checkout space reads 9 releases in 90 days, with 2 failing, 1 slow, 7 waiting to ship and 5 shipped clean. Copy link and Download sit at the right: see Excel, CSV and Copy link.
What was read, and how old it is
One grey line says what the figures were counted from, such as From 9 releases and 54 work items in CHK. Then it says how old they are, Updated just now or Updated 12 min ago, and gives Recalculate.
Changeline keeps each answer for an hour, for you, for that scope and period, so the page opens at once. Recalculate reads Jira again and counts again. Your filters, tab and chips stay as they are.
- Change something in Jira, such as a version’s release date.
- Press Recalculate in the grey line.
- The button reads Recalculating, then the age reads Updated just now, and the figures follow the change.
Right after a count, the button reads Recalculate in 1 min, or Recalculate in a few seconds: a count that soon would read the same answer. It comes back by itself.
The Period chip
Period sets the last 30, 90 (the default), 180 or 365 days. Where the rows come from more than one space, a Space chip comes before it and counts only the space you pick.
The four keys
Each key shows its figure, a small trend, its count, a lozenge for how it moved and a link to what it counted. How each is counted: The four keys. What the lozenge compares: Against your own past.
The small trend is a bar for each week, or each month for 180 and 365 days. Each bar is the figure over the 28 days to the end of its week (90 days to the end of its month), reaching into the days before the period, so one quiet week does not drop to nothing.
- The latest bar is the bold one: where the figure stands now.
- The line under the bars says what a bar is, since when, and the figure now: 28 days to each week since 16 Aug · now 4.3 a month.
- The two numbers beside the bars give the scale. The change fail rate always runs from 0% to 100%, so spaces compare. The others are relative, rounded up to a clean top such as 5, 5d or 2w.
- Hover a bar for its 28 days and its figure.
- Until three weeks (or months) hold a figure, the line says Trend after 3 weeks.
The link under a figure opens the tab with what it counted, and clears the tab’s filters, so the rows are the figure’s:
- See 9 releases opens Releases, newest first.
- See the slowest opens Releases, the longest lead time first.
- See 5 failures opens Failures, the ones not recovered yet first.
- See 4 failed releases opens Releases with Failed only on.
A link that would open nothing is not drawn.
The Flow row
Four smaller figures say how the work flows. Hover one to see how it is counted and, where the days before were counted, how it moved.
- Time to ship: the median time from a work item reaching Done to the release that shipped it. Only where a deployment is a released version. See the releases opens Releases, newest first.
- Work in progress: the work items in progress now, and how long the oldest has been. See the work in progress opens Not released yet on the In progress stage.
- Bugs per release: the failures that point at a release of the period, over those releases. See the failures opens Failures, the ones not recovered yet first.
- Unplanned work: the share of the work items released in the period that are of a failure type. It has no link.
For example, the Checkout figures read Time to ship 2.2 days (of 54 work items), Work in progress 12 (the oldest 9.4 days), Bugs per release 0.6 a release (5 failures over 9 releases) and Unplanned work 6% (3 of 54 work items). 5 divided by 9 is 0.6.
A link is drawn only where something stands behind it: no work in progress, no link.
The amber box
Check these work items names what to act on, each key a link. The Checkout example lists 2 failures are not recovered yet: CHK-141, CHK-34, 1 released version has no release date, so it is not counted: Hotfix 1.4.1 and 1 work item has waited for release more than twice the usual, the longest CHK-142. Grey lines under the tabs explain a figure and never ask for action.
DORA here is the research programme at Google behind these four keys, not the EU’s Digital Operational Resilience Act. DORA is a trademark of Google LLC, and Changeline is not made or endorsed by Google.