Lesson 5 of 5
Sumline needs no setup. Once a Jira admin installs it from the Atlassian Marketplace, every work item with children shows its children rolled up and every space has a Sumline tab. This last lesson says where each view is and what it shows. New to estimates in Jira? Start with Add story points.
Where to find it
Sumline is in each of these places in Jira:
- Apps › Sumline in Jira’s sidebar: one table for any set of spaces, a saved filter or a JQL query. See Across spaces.
- A Sumline tab in every space, beside the space’s own tabs: under More when Jira’s tab bar is full, and in the left sidebar of a service desk space. See The space tab.
- The Details column of every work item with children: a Sumline group with its figures. See On a work item.
- The Sumline panel on any work item: open it from View app actions, the hexagon under the work item’s title. See On a work item.
- The Sumline gadget on any dashboard: add it in the dashboard’s Edit view like any other gadget. See The dashboard gadget.
Jira admins find its settings under Jira settings › Apps › Sumline settings. See Settings.


On a work item
The Details column. Every work item with children has a Sumline group in the right-hand column: story points and original estimate done / total, the time logged and the remaining estimate, each with how far it is past the estimate when it is (“1h over”, “ends 2h over”), a done / total line for each number field an admin added, % complete by estimate and by work item count with a bar each, and, in small amber lines, only what needs a look: the delivery checks that fail and the children that carry no estimate, by key. What only explains a figure, such as estimates left out, is on hover over it. Last, the age of the figures and Recalculate, bottom left. It is there as soon as the app is installed, with nothing to add; Jira may show the group closed until you open it. A childless story, a bug or a sub-task has nothing to roll up, so Jira leaves the group out. The panel works on any work item.

The Sumline panel. Open it from View app actions, the hexagon under the work item’s title. On a site Jira has not moved to that row yet, it is a named Sumline button in the same place. Each person opens it once. It shows totals for the fields being rolled up (by default all four: story points, original estimate, time spent, remaining estimate) and for any number fields an admin added, both percentages, a “Check the estimates” box naming the work items with no estimate and the values left out, and the children as a table: Work, Status, one column per field, Work items (every work item below that child, at all levels) and Warnings. The panel has no size limit. On an epic or above, Open in Sumline opens the work item under Apps, with the table’s grouping, columns and downloads.

Every view shows its age
Each view says when its numbers were computed (“Updated 3 min ago”). Sumline keeps the figures for five minutes per person, so opening a view again within that time reuses it. Its Recalculate button reads Jira again, so an edit you just made is one click from showing up; right after a recalculation it waits a few seconds (on a table, a minute) and says when it is back. The gadget has no button of its own: Jira’s reload icon on the gadget, or the dashboard’s Refresh, recalculates it.
Who sees what
Anyone who can see work items can use Sumline. It reads Jira as the person viewing, so everyone sees only the work items they could open themselves. The settings are for Jira admins: see Settings. What the app reads and stores is on Privacy, permissions and data.
Where next
The views in full: The space tab, Across spaces and The dashboard gadget. How the figures are worked out: How the numbers are calculated.