Sum story points to the epic in Jira Cloud
Jira does not add story points up to the epic. The Automation rule that does, in team-managed spaces too, where it goes wrong, and what Sumline does.
What Jira does by itself, the Automation rule that fills the gap and where it stops, then what Sumline does.
Jira does not add story points up to the epic. The Automation rule that does, in team-managed spaces too, where it goes wrong, and what Sumline does.
Jira does not add subtask story points up to the story. Atlassian’s Automation rule that does, where it stops, and what Sumline does instead.
Time logged on subtasks never reaches the epic in Jira Cloud. The two Automation rules that carry it there, their limits, and what Sumline does instead.
Why a Jira epic’s original and remaining estimates leave out its subtasks, how to total them from a search, and what Sumline does instead.
How far an epic is over its estimate and who logged the hours: what Jira adds up by itself, Sumline for the estimate and Logline for people and weeks.
Jira has no conversion between story points and hours. Why a fixed ratio misleads, and how to see points and time side by side per epic, with Sumline.
Jira’s levels from subtask to epic, which plan adds levels above the epic, what Jira adds up at each, and how Sumline rolls up through every level.
Where Jira shows an initiative’s progress, Atlassian’s Automation rule that sums its epics’ story points and where it stops, and what Sumline shows.
What Jira’s formula fields can calculate, why they cannot add up an epic’s children, what can, and what Sumline does.
Where Jira shows an epic’s progress, the Automation rule that writes % complete by count and by story points into a field, and what Sumline shows.
Where Jira draws a progress bar on an epic, why it counts work items and not story points, and Sumline’s bars by estimate and by count.
What Jira can add up across spaces by itself, an export that totals story points per epic, and Sumline’s one table across the spaces you choose.
Why Jira’s gadgets count work items but never add up story points per assignee, an export that totals them, and Sumline’s Group by over epics.
The Jira gadgets closest to an epic progress chart or report, how to add a % to them with Automation, and Sumline’s gadget, with an example.
Export an epic’s child work items from Jira to Excel or CSV and work out its % complete, or download every epic’s totals with Sumline.
What Plans rolls up on Jira Premium and what the step from Standard costs, what Standard gives you, and what Sumline costs beside it, at five site sizes.
Data Center end-of-life dates, what the migration assistant does with your apps that roll up, what Jira Cloud adds up by itself, and what Sumline does.
Epic Sum Up Free is the paid ESU Lite from 5 October 2026. The options, cheapest first: Jira’s own features, Automation, staying with ESU, and Sumline.
Pivot Report is on Connect, unsupported from 31 January 2027. Your options, cheapest first, from Jira’s own tools to Sumline and Logline.