Group by
Group by gathers a table’s rows under shaded lines that each add up their rows. Use it to see story points per person, per priority, per space or per sprint, which Jira’s own gadgets cannot add up.
Group a table
- Open the Sumline tab of a space, or Apps › Sumline and roll up a scope.
- In the row of filters over the table, press Group by.
- Pick a choice from the list. None puts the table back as it was.
A shaded line now sits over each group. It adds up the group’s rows: points, each number field, original estimate, logged and remaining time, and work items. The Group by chip is shaded while a grouping is on.

For example, Alana Grant’s line reads 13 / 29 points. Her three epics are APP-2 with 2 / 5, PAY-3 with 8 / 16 and LOY-2 with 3 / 8, and 2 + 8 + 3 = 13 of 5 + 16 + 8 = 29. Her 45% is 13 ÷ 29.
The choices
Group by gathers the rows by:
- Assignee, Priority, Status and Type;
- Space, on the page under Apps;
- Sprint and Fix version, both below;
- Team: Jira’s Team field on each row’s own work item, by the team’s name. A row with none takes the team its work items directly under it share, and “No team” comes last.
A choice that does not apply to the rows on screen is not in the list: Type with one work type, Space with one space, Sprint with no work in a sprint, Fix version with none planned for a release, and Team on a site with no Team field or no team on any row.
Both percentages are worked out again from the group’s sums, not averaged. A group of 5 of 8 points and 0 of 8 reads 31%, which is 5 of 16.
The groups come in their field’s own order: your site’s priorities from the highest, To Do before In Progress before Done, people alphabetically, initiatives before epics, spaces by key and teams by name. Nobody assigned, no priority and no team come last. The rows inside a group keep the Sort by order. The filters apply first, so a group with no row left is not shown.
A space’s line names it after a folder. It opens Sumline’s tab in that space.
Each piece of work is counted once
An epic is a row of its own and also part of its initiative’s row.
- When both are in the same group, the group’s line counts the initiative and leaves the epic out. Hover the group’s name to see which rows it counted once.
- When the initiative is in one group and the epic in another, say with different assignees, the epic’s work is in both lines. Hovering the initiative’s group says so. Lines from different groups are not meant to be added together.
By sprint and by fix version
Here a row stands under each group its work is in, with only that work’s figures. An epic with stories in two sprints is under both sprints.
- Each work item counts in one sprint, its current one. That is the active sprint, else the next one planned, else the last one it was in, as Jira’s sprint report counts a work item carried over. So the sprint lines add up to the table.
- A subtask counts in its story’s sprint and release.
- A work item planned for two releases counts in both. Hover either release’s name to see which work items.
- Work in no sprint, or in no release, is the last group.

For example, APP Sprint 1 adds up APP-2 (2 / 5), APP-1 (6 / 8) and APP-3 (5 / 16) to 13 / 29. Add the four sprint lines, 13 + 11 + 19 + 19, and you reach the Total of 62 points.
The Total line
The table’s first line adds up every row on screen by the same rule. An epic inside an initiative that is also on screen is counted once, in the initiative. Filter the initiative out and the epic counts on its own.
Share a grouped table
On the page under Apps, the address holds the spaces and the grouping, such as
?spaces=APP,PAY,WEB&group=assignee. Send it, or press Copy link, and it opens
the same grouped table. The downloads hold the group lines too; see
Grouped tables.