HelpWarnings and the Check these work items box

Warnings and the Check these work items box

Sumline names what it could not count, and what may hold the work up. None of these notes changes a figure except the two remaining-estimate rules below. This page says what each note means and where to find it.

Where the notes show

  • The Sumline panel has one amber box, Check these work items. It holds what to act on: the delivery warnings first, then the work items with no estimate. Each work item it names is a link.
  • Grey lines under the panel’s figures explain a figure: estimates set aside, remaining estimate not counted or worked out, work a percentage leaves out. They are not in the box.
  • The Details column shows the same amber lines, small, and puts the grey explanations on hover over the figure they are about.
  • The tables and the gadget have a Warnings column. Hover a marker to see its work items.
  • The Excel and CSV downloads put the work items in the Delivery warnings and Exclusion note columns, see Exporting to Excel and CSV.

Work items with no estimate

A work item with no value in any estimate rolled up (story points, original estimate, remaining estimate, or a number field of your own) adds nothing to the estimate totals. It is never counted as 0. Sumline names it instead:

  • the panel’s box lists the unestimated work items. A subtask appears with the row it sits under, such as “WEB-14 (under WEB-12)”;
  • the panel’s child table marks such a child “No estimate”, or “N unestimated” when only some of the child’s own subtasks are estimated. Hover to see which;
  • the Details column names them in one small amber line, “No estimate:” and their keys;
  • the tables and the gadget show “N unestimated” in the Warnings column.

A work item whose parent’s estimate is the one counted is covered by it, so it is not called unestimated. Time logged on an unestimated work item still adds to Logged.

A “Check these work items” box: one work item has no estimate, WEB-15. Its key is a link.
The panel’s “Check these work items” box: the work item it names is a link

For example, WEB-1 has twelve work items under it. WEB-15 has no estimate, so the box says “No estimate: WEB-15”, and WEB-15 adds nothing to Story points, not even a 0.

Delivery warnings

Besides the warnings about estimates, the Warnings column names what may hold the work up, for the row and everything under it:

  • Overdue: not done, and past its due date, as the day is where you are. A work item due today is overdue from tomorrow.
  • Over estimate: logged plus remaining is more than the original estimate. The panel names each work item with where its work ends, as a percent of the estimate. It is never 100% once over, such as “ACME-2 133%”. An original estimate of 0 counts as no estimate.
  • Closed early: done, with a work item under it still open.
  • Ready to close: still open, with every work item under it done.

For example, a work item with an original estimate of 3h, 3h logged and 1h remaining ends its work at 3h + 1h = 4h. That is 133% of 3h, so the panel says “ACME-2 133%” for it. Jira lowers the remaining estimate by what is logged. On a work item nobody touched, this warning therefore means more time was logged than estimated. It fires earlier where someone raised the remaining estimate by hand. A done work item’s remaining counts as 0, as in the Remaining figure.

Closed early and Ready to close read every work item under the row, as Jira has them, even with Done only on: that setting changes what is counted, not whether work is open.

A Jira admin can switch each warning off, and switch on three more: No due date, Unassigned and Logged, no estimate (time logged with no original estimate). See Settings.

Remaining on done work items

Jira does not clear a work item’s remaining estimate when the work item is closed. It only goes down as time is logged. A subtask closed without logging its time keeps its whole estimate, so an epic whose work is all done would still show hours left.

So, by default, Sumline does not count the remaining estimate of a done work item, and says what it left out:

  • the panel names the work items and the amount in a grey line under its figures, such as “Remaining on done work items: SLC-81 and SLC-84. 7h is not counted”;
  • the tables and the gadget mark the row “7h remaining on done” in the Warnings column;
  • the downloads add the same sentence to the row’s Exclusion note.

The work item still counts as estimated, and its original estimate and time spent are added as before. Only the remaining estimate, and the “% complete by time” worked out from it, change. A value already set aside because a parent and its children both carry an estimate is named there, not twice.

An admin can switch this off in Settings to count Jira’s remaining estimate as it is.

Remaining missing in Jira

When work is logged, Jira lowers the work item’s remaining estimate by the time logged, never below 0. Work items created through the API, imported from a CSV, or logged with “leave estimate unchanged” can end up with an original estimate and logged time but no remaining estimate at all. Counting that as 0 left would show the work as finished: an epic with 470h logged against 594h planned would read 100%.

So where a work item has an original estimate and no remaining estimate, Sumline uses what Jira would have kept: the original estimate minus the time logged on that work item, never below 0. A done work item gets 0. Each work item is worked out on its own, so one running over does not hide another’s remaining work. That epic reads 79%, with 123h 30m remaining.

This happens only while Original estimate is one of the fields rolled up. Without it, remaining is taken as Jira has it, empty included. A work item whose remaining estimate is 0 in Jira keeps its 0. A worked-out value never makes a work item count as estimated: that still comes from its original estimate.

Sumline says where it did this:

  • the tables show “worked out” under the Remaining figure, and its tooltip names the work items;
  • the panel names them in a grey line under its figures, “Remaining worked out: SLC-62 and SLC-69”, and the Remaining figure says “(worked out)”;
  • the downloads add them to the row’s Exclusion note.

How a worked-out value meets a parent’s own estimate is under Each estimate counted once.

Other grey lines

  • Own estimates left out, “Mixed estimates”: a parent and its children both carried an estimate. See Each estimate counted once.
  • Other story points field, “N in other SP field”: a work item carries points in the other kind of space’s field. See Team-managed and company-managed spaces.
  • Hidden, done only, “N hidden (done only)”: Done only left a branch out. See Settings.
  • Left out of the %: estimated work the percentage cannot weigh. See % complete.
  • Counted elsewhere: a work item linked under two parents counts under the first. See A level above epics.