HelpPlan across spaces

Plan across spaces

Under Apps, Workline plans one scope: any set of spaces, a saved filter or a JQL search. A person’s work in all of it lands in one row, so someone busy in two spaces shows as over capacity where each space’s tab alone would not.

Open it

  1. In Jira’s left sidebar, open Apps and pick Workline. It opens on a scope for you; see “How the scope is remembered”, below.
  2. Under Scope, choose Spaces, Saved filter or JQL.
  3. Pick what to plan. For Spaces, pick one or more from the list; for Saved filter, pick a filter; for JQL, write a search, such as project = WEB AND fixVersion = "2.0". Jira checks a JQL search as you write it and says what it does not accept.
  4. Press Show plan. Workline plans the open work items the scope finds that have an estimate: a row per person, a column per week.

One person, two spaces

Apps › Workline with the spaces MOBILE and PORTAL planned for eight weeks: “9 people, 1 placeholder” with 3 Over capacity and 5 With time free, under it “Planned from 30 work items in MOBILE, PORTAL · 8h a day, Mon–Fri (Jira’s time tracking)”, then the filters from Space to Sort and an Everyone row first. Emma Paris, a designer, is open on PORTAL-10, PORTAL-14, MOBILE-4 and MOBILE-9 and her Customer workshops booking: 56h in 7–13 Dec in a red 140%, 130h in all, and her Customer workshops booking from 21 Dec to 1 Jan. Ada Isadora, Alana Grant, a Backend developer placeholder and the other people follow, with a share lozenge in each week they have hours.
Apps › Workline over the Customer Portal and Portal mobile app spaces: Emma Paris opened on her work items, 56h and a red 140% in 7–13 Dec

Emma Paris has work in two spaces. In 7–13 Dec, PORTAL-10 gives her 20h and MOBILE-4 gives her 36h: 56h. A full-time week of 8h a day, Monday to Friday, is 40h, and 56 ÷ 40 is 140%, in red.

The Customer Portal tab shows her 20h, 50%. The Portal mobile app tab would show her 36h, 90%. Neither tab is over. Under Apps, with both spaces in the scope, her row adds them, and the week is red. Press Over capacity in the filters to keep only the people in that state:

Apps › Workline over MOBILE and PORTAL with Over capacity pressed: “3 of 9 people” with 3 Over capacity, the Everyone row first, then Emma Paris open on PORTAL-10, PORTAL-14, MOBILE-4 and MOBILE-9 with 56h and 140% in 7–13 Dec, then Ada Isadora with 52h and 130% in 30 Nov–6 Dec and Alana Grant, both closed. Clear filters sits at the end of the filter row.
Apps › Workline with Over capacity pressed: the three people over capacity, Emma Paris open on her work items

What differs from a space’s tab

  • The scope row. A space’s tab has none, since the space is the scope. Under Apps you choose the scope, and a line above the filters says what the plan was read from, such as “Planned from 30 work items in MOBILE, PORTAL”.
  • The Space filter. Space is the first chip in the filter row, and counts only the work items in the spaces you pick. It is drawn where the work items come from more than one space. A space’s tab has no Space filter.
  • Rows › Space. Set Rows to Space for a row per space, each opening to its people and their work items. See Roles and rows.
  • Bookings. A booking counts where the plan covers it: the spaces you pick, or a filter or JQL search that reads a work item in it. See Book time.
  • Teams. Team plans one team across the scope: every member gets a row, with or without work in these spaces. See Teams.

Rows set to Space looks like this:

Apps › Workline over MOBILE and PORTAL with Rows set to Space and Sort set to Total: “3 spaces”, then Customer Portal open with 16 work items and 1 booking, 412h in all, its people Ada Isadora (open on PORTAL-4, PORTAL-5, PORTAL-6 and PORTAL-17), Alana Grant, Emma Paris, Jennifer Evans, Kevin Campbell, Max Taylor and Ryan Lee, then Booked time 120h, then Portal mobile app with 14 work items and 186h, and Not in a space with 2 bookings and 96h, both closed.
Rows set to Space: a row per space, Customer Portal open with its people

The rest reads as on a space’s tab: The plan.

How the scope is remembered

  1. Press Show plan. Workline keeps the scope you showed, for you only.
  2. Open Apps › Workline another day. It opens on that scope. A link with a scope in its address, such as one from Copy link, opens on the link’s scope first.
  3. With nothing kept and no link, it opens on the spaces you opened last in Jira, up to five.

A scope is kept for 90 days from the last time you changed it, then deleted. A scope Jira reads none of, such as a filter that is gone, is dropped without a word and the next choice opens. See What is stored.

The limits

  • A long list of spaces. Where the list stops short, a grey line under the field says “Only the first … spaces by name are listed. For the others, use a saved filter or JQL”.
  • 5,000 work items. Workline reads at most 5,000 open work items for one plan. A scope with more shows no plan; pick fewer spaces, a team or fewer weeks. See The plan, “When a scope is too large”.
  • Copy link. It gives the plan as it is, with the scope and every choice in the address, so whoever opens it sees the same plan.