Skip to content
Menu
HelpThe work item panel

The work item panel

Workline shows what one work item does to its assignee’s weeks, and who has room to take it. It does this in two places on every work item: the Workline panel, and a short glance in the Details column.

Both read the plan of the work item’s own space, the same eight weeks as that space’s Workline tab. They count hours, whatever unit the plan is in.

Open the panel

On a work item, open View app actions, the hexagon under the work item’s title, and pick Workline. The panel loads on the work item you are on.

Workline’s panel on PORTAL-5 Return label PDF: a grey first line with Ada Isadora, her week of 30 Nov–6 Dec and Recalculate, rows with bars for this work item, Ada’s week at 52h of 40h in red and the week without it at 28h, an amber box saying Ada Isadora is over capacity in 9–15 Nov, a table of what fills her week, a Who has room table with each person’s hours that week and with PORTAL-5 and a Move on each, and a link to open Workline.
Workline’s panel on PORTAL-5: the figures, the amber box, the assignee’s week and who has room

What the panel shows

From the top:

  1. The facts line. The assignee and the week, such as “Ada Isadora · week of 30 Nov–6 Dec”. When the work item spans several weeks it names them, such as “2 weeks, 30 Nov–13 Dec”, and everything below is about the assignee’s busiest of those weeks. Its right end holds the age of the figures and Recalculate, which reads Jira again. A plan is kept for ten minutes, the same one the space’s tab uses.
  2. Three figure rows, each with a grey hint and a bar:
    • This work item. Its hours, with where they came from, such as “Spread over 30 Nov–4 Dec, its start and due dates”. Its bar is the share of the assignee’s week it takes.
    • The assignee’s week, labelled with their first name, such as Ada’s week. A name longer than 16 characters reads Assignee’s week. It is their whole load against the hours they can work, such as “52h of 40h”, with the share as a lozenge: green to 100%, yellow to 120%, red past it. The bar is green up to what they can work and red past it.
    • Without it. The same week if the work item moved away, with “if it moved away” beside it.
  3. Grey lines that explain a figure: a remaining estimate worked out from the original, a work item past its due date or sprint end and so planned for today, a week shorter than usual because of a holiday or time off, and hours that fall after the last week shown.
  4. An amber box, Check these work items, when the assignee is over capacity in a week this work item is planned in. It names each such week.
  5. The assignee’s week as a table. This work item first, tagged This work item, then their other work items that week, the most hours first, each with its status and hours. Their bookings follow, tagged Booked. It lists ten rows, then Show more.
  6. Who has room. The other people on the space’s plan, the lightest first. Each row shows their hours in the work item’s week or weeks (That week or Those weeks), their hours With PORTAL-5 (the key of this work item), and a Move button. Move opens the Move dialog with that person picked. After ten people, Show more lists the rest, and Move to someone else opens the dialog with nobody picked.
  7. Open in Workline. Opens the space’s Workline tab with the assignee picked, in a new tab.

Only active people who can be given the work item are in Who has room: not the assignee and not a placeholder. Where nobody else is on the plan, the table and Move are not drawn.

For example, PORTAL-5 is 24h and Ada Isadora has 52h in 30 Nov–6 Dec against 40h she can work: 130%, in red. Without PORTAL-5 she would have 28h, 70%. In Who has room, Alana Grant has 0h that week, and 24h with PORTAL-5: 60% of her 40h. Kevin Campbell works 6h a day, Monday to Thursday, so he can work 24h; 4h and PORTAL-5’s 24h make 28h, 117%, in yellow.

When a work item is in no week

A work item that Workline does not plan says why in one line, with the age and Recalculate at the top:

  • Assign someone and Workline shows their weeks. Nobody is assigned.
  • Add a remaining estimate and Workline plans it. It has no remaining estimate, and no original one to work it out from.
  • This work item is done, so Workline plans none of it.
  • Its child work items carry estimates, so theirs count and this work item’s own is left out. A parent and its children are counted once, the children winning.
  • … has no dates and no sprint, so it sits in no week yet. It names the assignee and the hours. Add a due date or a sprint and Workline places it, or plan it from the plan.
  • … falls after the 8 weeks Workline shows, so none of it is in a week yet.
  • Workline does not plan this work item in this space’s plan. None of the reasons above applies, and the plan holds no row for it.
  • This scope holds more than 5,000 work items to read. The space is too large to plan; see The plan.

Where someone could be given the work item (no one assigned, no dates, or past the weeks shown), Who has room for it follows, with each person’s next 8 weeks and a Move. That is how a work item with nobody assigned gets someone.

The Details column

The same answer in a narrow column, under Workline in the work item’s Details. It is drawn only on a work item that has an original or remaining estimate of its own, so a parent whose children carry the estimates has the panel but no Details section.

Workline’s section in a work item’s Details column in Jira, PORTAL-5: Planned 24h in 30 Nov–6 Dec, Ada Isadora 52h with a red 130% lozenge that week, Room: Alana Grant 40h free, an amber line saying Ada Isadora is over capacity in 30 Nov–6 Dec, and Updated just now with Recalculate.
Workline in the Details column of PORTAL-5: planned hours, the assignee’s week, who has room and the amber line

Its rows:

  • Planned. This work item’s hours, with its weeks in grey, such as “30 Nov–6 Dec” or “in 2 weeks, 30 Nov–13 Dec”. Hover for where the hours came from.
  • The assignee. Their name, or Assignee’s week when it is too long, with their load in the busiest of those weeks, a lozenge, and “that week” or “busiest week”.
  • Room. The lightest other person with time in those weeks, such as “Alana Grant 40h free”. Drawn only when someone has some.
  • The amber line, when the assignee is over capacity, then the age and Recalculate as the last line.

There is no Move and no table in the column; they are the panel’s. A work item in no week gets one short line in their place, such as “Nobody is assigned yet”, “No remaining estimate to plan” or “Done, so nothing is planned”.

What the panel counts

  • Tentative bookings always count, whatever the plan’s Include tentative switch says: a figure that left out half-promised time would understate the week. See Book time.
  • Hours only. The panel and the column stay in hours when the plan is in story points.
  • Read as you. Workline reads the plan with your Jira permissions, so you see only the work items you may browse.

Move is the only thing in the panel that changes Jira: it sets the work item’s assignee and, if you give one, its due date, as you. See Move work. What the panel says when the licence is inactive or a read fails is in Messages you may see.