Skip to content
Menu
HelpThe Details column

The Details column

The Details column is a glance of the work item panel, without opening it. The figures and the bars are the same.

Where to find it

  1. Open a work item in Jira that has time logged, sub-tasks or child work items.
  2. Look at the Details column on its right, under Logline.
  3. If the group is closed, select its name. Jira may show it closed until you open it.

A work item with none of those has no Logline group.

What it shows

The group is laid out as Jira’s own Details, each label in bold with its value beside it.

  • Original estimate, Logged and Remaining, each with its bar. Logged also gives the day time was last logged, “last 6 Oct”.
  • The amber line naming the child work items over their estimate, such as “Over estimate: HLAB-5 158%, HLAB-2 150% and HLAB-3 135%”.
  • Under a billable rule, Billable: the hours, the share as a lozenge and the amount. Under it, Billable at end: the hours the work ends at, with a lozenge.
  • Unless an admin turned Bill up to the original estimate off, the same amber line as the panel: “Ends with 157h 15m not billable: HLAB-5 109h 15m, HLAB-3 42h and HLAB-2 6h”.
  • The age of the figures, with Recalculate, as its last line.

What each figure means, and how the colours and the bars are drawn, is on the work item panel; nothing is repeated here.

Logline’s part of an epic’s Details column: Original estimate 542h, Logged 470h 30m with “last 6 Oct” beside it, and Remaining 184h with their bars on one scale, the remaining running red past the estimate, Billable 456h 30m at 97% and, under it, Billable at end 497h 15m at 76%, an amber “Ends with 157h 15m not billable:” line naming HLAB-5 109h 15m, HLAB-3 42h and HLAB-2 6h, an amber “Over estimate:” line with their percents (HLAB-5 158%, HLAB-2 150% and HLAB-3 135%), and “Updated 3 min ago · Recalculate” as its last line.
Logline’s part of an epic’s Details column: estimate, logged, remaining and billable with their bars

What stays in the panel

The column keeps to what you look at first. The small grey notes are in the panel, and the column says them on hover:

  • over Original estimate: any estimate left out, and the child work items with time logged and no original estimate;
  • over Remaining: that it was worked out;
  • over the Billable lozenge: where the time that is not billable went, such as “6h of 14h is not billable: HLAB-5 and HLAB-7”.

The child work item table and Recent worklogs are only in the panel.